MANILA, Philippines — The Energy Regulatory Commission (ERC) announced that it has issued the 2025 Amended Rules Enabling the Net-Metering Program for Renewable Energy.
The regulator said this development aimed to streamline the implementation of the net-metering program and make renewable energy (RE) adoption more accessible to qualified end-users.
ERC amends net-metering rules to expand renewable energy options
Following a series of public consultations and careful review of stakeholders’ inputs, the ERC issued Resolution 15, Series of 2025, introducing key amendments aimed at strengthening consumer protection and simplifying processes for availing of the program., This news data comes from:http://www.ycyzqzxyh.com
As per the ERC, one of the key amendments permits the banking and rollover of net-metering credits toward a qualified end-user's electricity usage across current and future billing periods.
It added that in the event of a property ownership change, the credits may be transferred to the new owner, subject to conditions such as a conforme letter from the original owner.
Net-metering allows customers of distribution utilities to install an on-site Renewable Energy (RE) facility not exceeding 100 kilowatts (kW) in capacity so they can generate electricity for their own use.
In turn, any electricity generated that is not consumed by the customer is automatically exported to the distribution utility's’s distribution system.

- House starts flood control probe
- Pope demands end to 'collective punishment' and forced displacement of Palestinians in Gaza
- PH, Australia hold live fire drills during ALON 2025 in Nueva Ecija
- Trump frustrated after thinking he made headway on Russia-Ukraine talks only to see Putin balk
- South Korea's Lee faces pivotal test at first summit with Trump
- Taiwan: China illegally deploying oil rigs in our waters
- Lacson to govt: Protect education budget
- DPWH exec fired, 2 others face dismissal over flood control mess
- 95 IMAGES OF MARY
- House tackles P881B public works budget amid flood control anomalies